Taking the Lead 
 in over 40 countries around the world 
 Lead Systems 
 Impact Hammers 
 Reverse Circulation Drills 
 Hard Rock Drill Bits 
 Custom Foundation Equipment 
 Site Support 
 Project Planning 
 600 Ferguson Avenue North 
 Hamilton, Ontario, Canada L8L 4Z9 
 Tel: 1.905.528.7924 Fax: 1.905.528.6187 
 Toll Free: 1.800.668.9432 (in Canada and USA) 
 www.berminghammer.com 
 Email: bfssales@berminghammer.com 
 along with a duel-filtration system. We recommend having  
 a spare filter on hand along with fuel additives to reduce the  
 amount of water in the fuel.” 
 Preventing lost time 
 To help prevent lost time on projects, Patterson says a second  
 piece of equipment would be wishful thinking, but not necessarily  
 a fiscally responsible decision. 
 “Instead of having a backup piece of equipment, just bring  
 in quality equipment!” he said. “A properly trained operator  
 with a decent inventory of spare parts can easily keep the  
 Junttan working through most conditions.” 
 Sandberg says lost time can be prevented by properly  
 planning the project, having the recommended parts on site  
 and scheduling sufficient time for inspections and maintenance  
 on the equipment. Liebherr Canada supports the  
 customers with complete maintenance and repair programs,  
 which include inspections and complete service and parts  
 supplied and installed on site at regular intervals. This provides  
 the customers with a complete and worry-free solution,  
 maximizing uptime and performance of the equipment over  
 its full lifetime. 
 “Working directly with the manufacturer allows direct  
 access to our research and development teams that are continually  
 striving to enhance and improve products operating  
 in extreme environments across the globe,” said Sandberg.  
 “For major projects, the selection of the appropriate machinery  
 is essential and we will assist with application reviews to  
 ensure the right machines are deployed.” 
 Grindle adds that with the right planning, anything can  
 be possible. 
 “Usually the biggest obstacle of transporting is not so  
 much the isolation of the site, but the road bans. It can take  
 a lot of permits and road diversions to get large equipment  
 to the target location. And – as far as a challenge to get to  
 isolated job sites – well, everything is achievable if you make  
 a plan.”  
 FEATURE 
 A Liebherr LRH 100  
 piling rig on a project  
 in northern Alberta 
 LIEBHERR CANADA LTD. 
 PILING CANADA 19 
 
				
/www.berminghammer.com
		link
		/www.berminghammer.com
		link