COMPANY PROFILE 
 » Top left: The site of  
 the Cabin Gas Plant  
 Phase 2 project, a  
 large pile driving  
 operation that  
 took place in a very  
 remote area (about  
 100 kilometres north  
 of Fort Nelson,  
 B.C.) during the  
 winter of 2011–12 
 » Top right: One  
 of the large rigs in  
 Ledcor Foundations’  
 arsenal of equipment 
 » Bottom left: For  
 the Fort Hills Oil  
 Sands Project, Ledcor  
 Foundations drove  
 3,000 open-ended,  
 30-inch diameter,  
 steel piles 
 » Bottom right:  
 Ledcor installing  
 steel pipe piles 
 PHOTOS COURTESY OF LEDCOR FOUNDATIONS 
 PILING CANADA 35